The following information is about Development Costs.

Development Costs Defined

Costs incurred to obtain access to proved reserves and to provide facilities for extracting, treating, gathering, and storing the oil and gas. More specifically, development costs, depreciation and applicable operating costs of support equipment and facilities, and other costs of development activities, are costs incurred to:
* Gain access to and prepare well locations for drilling, including surveying well locations for the purpose of determing specific development drilling sites; clearing ground; draining; road building; and relocating public roads, gas lines, and power lines to the extent necessary in developing the proved reserves.
* Drill and equip development wells, development-type stratigraphic test wells, and service wells, including the costs of platforms and of well equipment such as casing, tubing, pumping equipment, and the wellhead assembly.
* Acquire, construct, and install production facilities such as lease flow lines, separators, treaters, heaters, manifolds, measuring devices, production storage tanks, natural gas cycling and processing plants, and utility waste disposal systems.
* Provide improved recovery systems.

This definition is in context to Energy. See more contextual defintions for Development Costs.


Navigation: [ 1 2 3 4 5 Next ]

Thoughts on the Continuing Crisis

Published September 6, 2008, 1:50 pm, GoldSeek.com

We are entering the next stage of the credit crisis, and one which is potentially more troubling than what we have seen over the past year, absent some policy reactions by the central banks and governments world wide.

Full Story


Landfill, recycling operation planned in Cherokee County

Published September 6, 2008, 1:24 pm, Spartanburg Herald-Journal

Published: Saturday, September 6, 2008 at 3:15 a.m. Last Modified: Saturday, September 6, 2008 at 1:06 a.m. GAFFNEY - Reduce, reuse and recycle is the goal, and Cherokee County might help by endorsing a 3Cycle Environmental Management Center.

Full Story


add. formats

Published September 6, 2008, 1:16 pm, Kavkaz Center

The outbreak of the Russian-Georgian War earlier this month apparently caught Ankara as poorly prepared as it caught Washington. The Turkish Foreign Ministry's section dealing with the Caucasus reportedly was virtually unstaffed.

Full Story


CYPHER® Sirolimus-eluting Coronary Stent Comparable To Bypass Surgery In Key Safety Measures In Patients With Diabetes ...

Published September 6, 2008, 12:14 pm, Medical News Today

Data from the largest randomized trial of its kind performed to date indicate that the use of percutaneous coronary intervention (PCI) with the CYPHER® Sirolimus-eluting Coronary Stent was comparable to bypass surgery (coronary artery bypass grafting or CABG) in key safety endpoints in patients with multi-vessel disease and diabetes.

Full Story


INDUSTRY & ECONOMY

Published September 6, 2008, 12:02 pm, The Hindu

AUTOMOBILES: Automobiles: Working on a better product mix The pause in demand due to high interest rates coupled with rising input costs have battered the auto sector in recent times. Raw material costs for five majors — Tata Motors, Ashok Leyland, Mahindra and Mahindra, Maruti Suzuki and ...

Full Story


Bharti Axa fund offers sops for online investors

Published September 6, 2008, 11:49 am, Business Standard India

Bharti Axa Mutual Fund has devised a new way to persuade investors to switch to the online model. The fund house is launching a plan under its maiden equity scheme, wherein investors opting to receive all communication through email will be charged 0.25 per cent discount on management charges.

Full Story


Indian engineering firms see big opportunity in NSG waiver

Published September 6, 2008, 11:46 am, Business Standard India

India's entry into the 45-nation Nuclear Suppliers Group (NSG) is likely to help the country become a major hub for manufacturing of nuclear components and reactors, as domestic engineering companies are expected to strike global alliances to serve the global nuclear market.

Full Story


Pacific Gas & Electric dumps MMS wave process, county to sue FERC

Published September 6, 2008, 11:33 am, Mendocino Beacon

The Pacific Gas and Electric Company decided last week not to be the national test case for the Minerals Management Service's wave energy program. Just two weeks earlier, the utility officially filed paperwork to pursue those same far offshore wave energy leases.

Full Story


Transmission grid problems must be fixed to meet targets for renewable power

Published September 6, 2008, 11:14 am, Sunday Herald

from renewable sources by 2020 unless the government fixes the country's transmission problems quickly, a senior executive of a leading wind farm developer will tell a major energy conference this week.

Full Story


Hot technology that could change health care

Published September 6, 2008, 10:11 am, CTV.ca

Advances in health care run the gamut from mind-boggling medicines to simple web solutions that, if adopted, could slice huge slabs of fat from a bloated system.

Full Story


Navigation: [ 1 2 3 4 5 Next ]

Are you looking for additional Energy > Development Costs news? Try our new "Development Costs News Focus" area.

Off-site Development Costs Links, User Submitted

The following links have been collected through user bookmark submission in the Development Costs category. Please note, because these resources are off-site we cannot guarantee the accuracy or quality of any information.

Wed Sep 3

Wed Aug 20

  • COCOMO II Calculator - USC Expert COCOMO II: COCOMO II with Heuristic Risk Assessment
  • COCOMO II model - Estimating SW Development Costs: COnstructive COst MOdel II (COCOMO II) is a model that allows one to estimate the cost, effort, and schedule when planning a new software development activity. COCOMO II is the latest major extension to the original COCOMO (COCOMO 81) model published in 1981. It consists of three submodels, each one offering increased fidelity the further along one is in the project planning and design process. Listed in increasing fidelity, these submodels are called the Applications Composition, Early Design, and Post-architect ure models.

Fri Aug 15

Mon Aug 11

  • Gamasutra - EIF: Deering Says Only 3 Of 10 Games Recoup Costs: "Despite all this growth, however, Deering warns that current development costs, currently in excess of $10 million for major titles, are unsustainable, given that less than 3 out of 10 games actually recover their costs." I knew it was bad, but I'd never thought of it like that.

Mon Jul 21

Thu Jul 10

Sun Jun 8

If you would like to find additional social bookmark based links on the topic of we recommend the Open Tag Directory > Development Costs. If you would like to find related tags we recommend Tag Patterns > Development Costs

Off-site Development Costs Research Links

If you still need additional information on Development Costs then we suggest the following off-site resources. Please note, because these resources are off-site we cannot guarantee the accuracy or quality of any information.

Energy

If you know the Energy Term Name use the links below to quickly jump to your desired focus.



Bookmark Us

The On Topic Network

This website is part of The On Topic Network.

Thank You

Energy.On-Topic.net was developed by Odin Metatech, Inc and runs on the Odin Assemble platform.

Best Viewed With

License

Creative Commons License This work is licensed under Creative Commons.




Powered by Odin Assemble 2.5a